Skip to main content
Amanah Builders & Estate logo

Grey Structure

The structural shell — done right from the ground up

Foundations, RCC columns and slabs, brickwork and plaster — built with A-grade materials, supervised at every pour, and documented in writing.

What's included in grey

Our grey structure scope is defined in writing before you sign — no ambiguity on inclusions or brand-grade of materials.

Rates

Indicative grey structure rates

Per sq ft of covered area, in PKR, for 2026. Final rate depends on structural design, plot access, and specified material brands.

Standard A-gradeCement, steel and brick specified in writingPKR 2,500 – 2,800 / sq ft
Premium A-gradeHigher-grade concrete, upgraded steel, premium finish plasterPKR 2,900 – 3,400 / sq ft

Rates last reviewed April 2026. Material prices shift month to month — always request a current written quotation.

How we work

A disciplined build process

  1. 01

    Scope & quote

    Written scope, material specifications, rate and timeline — all before any contract.

  2. 02

    Site mobilisation

    Site layout, utility connections, safety setup, and labour housing arranged.

  3. 03

    Structural build

    Foundation to slab roof with stage-wise quality checks and client sign-off.

  4. 04

    Handover to finishing

    Clean handover with material receipts, as-built notes, and structural walk-through.

Material brands in writing

Cement, steel and brick brand/grade is part of the contract — not a verbal promise.

Weekly photo updates

Photos and short videos of every key stage — foundation, columns, slab, brickwork.

Supervised, not just sub-let

On-site supervision at every pour and every inspection. Not a phone-in contractor.

FAQs

Grey structure — common questions

What is grey structure exactly?
Grey structure is the complete structural shell of a house — foundation, RCC columns and slabs, brick walls, plaster, water/septic tanks, and basic conduiting. It does NOT include finishing items like flooring, paint, electrical fixtures, sanitary fittings, kitchens, doors, or woodwork.
What materials do you use for grey structure?
Standard brands include DG Khan / Maple Leaf / Bestway cement; Ittefaq / Mughal steel; A-grade 'awal' bricks. Premium tier uses high-grade concrete mixes and brand-specific steel. Exact brand and grade are written into your contract.
How long does grey structure take?
Typical timelines: 5 marla (single storey) — 3 to 4 months; 10 marla (double storey) — 4 to 6 months; 1 kanal (double storey) — 6 to 9 months. Weather and design complexity add variability.
Can I hire you for grey only and finishing elsewhere?
Yes. We quote grey and finishing separately if you want to split work between contractors. We still coordinate a clean handover with material receipts and as-built notes so the next contractor has full context.
Do you handle CDA/RDA approvals?
We can coordinate the structural map approval with CDA/RDA — see our Architectural & Map Design service for details.

Get a grey structure quote in writing

Share your plot size and map — we'll return a scope-clear, material-specific written quotation.