Construction Tool
House construction cost calculator — Islamabad 2026
A quick, realistic estimate for grey structure, finishing, or turnkey construction. Use it to plan — then request a real written quote for commitment.
Estimated cost
1.13 Cr – 1.26 Cr
At PKR 2,500–2,800/sq ft for 4,500 sq ft of covered area.
- · Rates reflect April 2026 material and labour pricing.
- · Rates exclude government fees (CDA/RDA, map approval), utility connections, and plot-specific extras.
- · Your final quote depends on structural design, plot access, and material specs.
FAQs
About this calculator
- How accurate is this calculator?
- This calculator gives a realistic range for indicative planning. Final rates depend on structural design, plot access, specified material brands, and site conditions. A real written quotation from us will be more precise.
- What's included in the rates?
- Grey rates cover foundation, columns, slabs, brickwork, and plaster. Finishing rates cover flooring, paint, electrical, plumbing, kitchens, wardrobes, doors, and woodwork. Turnkey rates include both. Government fees, utility connections, and imported high-end fixtures beyond the selected tier are typically excluded.
- What's the difference between Standard and Premium tier?
- Standard uses quality local brands (e.g. premium Pakistani cement, steel, tiles, sanitary). Premium uses upgraded finishes — imported tiles, branded fixtures, custom woodwork, and higher-grade kitchens.
- How do I get an exact quote?
- Share your plot, map (if designed), and finishing tier — we'll respond with a scope-clear, material-specific written quotation within the business week.
Ready for a real written quote?
Share your plot details and finishing tier — we'll prepare a scope-clear, material-specific quotation.
